On the 28th of July-2016 we completed contracted SOW for this project.

The Offshore Sub-Station “WIKINGER” has been built by NAVANTIA in its PUERTO REAL yard, for Spanish Owner IBERDROLA. The OSS WIKINGER will operate in the windfarm with the same name in the Baltic Sea.

The WIKINGER is one of the most important offshore-wind projects developed in Europe.

The project managed by INNOMARITIME included the design, fabrication and supply of equipment required for High-Voltage cables pulling; installation of HV cables on-board and assembly and pre-commissioning of auxiliary equipment required for offshore installation, completion and hook-up of HV electrical systems.

The scope of work has been performed to the full satisfaction of our Client, PRYSMIAN POWERLINK.

Operations detailed planning and coordination, as well as resources management, have been key for achieving requirements and goals set by our Client.